BIM
Solutions.
Get BIM models your team can use to review the design, coordinate trades and prepare drawings. We agree the model detail and intended use at each project stage, and work in BIM 360 or Autodesk Construction Cloud.
Start Project→
End-to-End BIM Services
We set up and manage BIM workflows for design, construction planning and handover. Model detail, schedules, quantities and asset information are agreed to suit your project.
BIM Implementation
We set up complete BIM systems and processes tailored to your workflow, including model templates, standards, and protocols that align with your project requirements.
BIM Coordination
Seamless stakeholder coordination across architects, engineers, contractors, and subcontractors throughout the project lifecycle using BIM 360 and Autodesk Construction Cloud.
3D BIM Modeling
Purpose-led model elements from conceptual LOD through fabrication and verified as-constructed records, with permitted uses defined in the BIM execution plan.
4D Construction Sequencing
Time-based simulations that link your 3D model to project schedules, enabling visualization of construction phases, delay identification, and resource optimization.
5D Cost Estimation
Accurate quantity takeoffs and cost estimates integrated directly into the BIM model, supporting budget optimization, life-cycle costing, and change order management.
BIM Analysis & Management
Energy simulations, structural analysis, and clash detection to inform design decisions, plus ongoing model updates, maintenance, and team training.
Scan-to-BIM Services
We build models from laser scans and point clouds. This helps renovation teams work with existing conditions when drawings are missing or out of date. Survey accuracy and model tolerances are agreed before modeling starts.
Our team prepares parametric models from supplied survey and laser-scan information for buildings, industrial plants, and infrastructure. We agree the required detail, information, tolerances and verification method before modelling. LOD 400 describes fabrication-level development; it is not, on its own, a guarantee of as-built accuracy.
Deliverable Formats
Agree the file types, software versions, model information and issue status in your scope. Not every format is needed on every project.
As-built 3D Modeling
Models prepared to agreed survey inputs and accuracy requirements
As-built 2D Mapping
Accurate floor plans and sections from point clouds
Scan to BIM
Point cloud data converted to intelligent BIM models
Parametric Modeling
Intelligent models with embedded data relationships
Heritage Documentation
Detailed documentation of historical structures
Renovation Support
Coordination for projects with limited existing data
Working with Spetia
A model your team
can work with.
Start with the drawings you have and what you need the model to do. We will work out the detail together.
Talk About Your ProjectBuilt for the next stage
A coordination model and a fabrication model need different levels of detail. We agree the model requirements, drawings and file formats around how your team will use them.
Review a first area
Check a first area with us before the rest of the work. We track clashes and review comments so your team can see what is resolved and what still needs a decision.
Model detail and survey accuracy are agreed separately. Final design approvals stay with the appointed design authority.
Technical details to agree before we start
Starting information
- The project stage and what the model will be used for
- Current drawings or scan data, with coordinates and units
- Your BIM execution plan, model requirements and software versions
Deliverables
- Models for each agreed discipline and a combined model
- An issue list showing who needs to act and what has been resolved
- The drawings, schedules and file formats listed in your scope
Review checks
- Model coordinates, naming, file health and required information
- Clashes against agreed rules and tolerances
- A first area or package for your review before the rest of the work
Agree the level of development (LOD) for each model element. An LOD label does not confirm survey accuracy, fabrication readiness or approval. Design and statutory approvals stay with the appointed design authority.
BIM and VDC technical guides
Clarify information requirements, model reliability, team integration, and delivery governance before production begins.
BIM LOD 100-500 Explained
Current BIMForum-aligned definitions, including the important distinction between LOD 400 and LOD 500.
Read guideBIM Execution Plan Guide
What a BEP should define for information, responsibilities, coordination, and delivery.
Read guideBIM Staff Augmentation
How to integrate specialist capacity into your templates, CDE, QA, and review process.
Read guideTransform Your BIM Workflow
Tell us the project stage, disciplines and deadline. We will discuss the scope and next step. A project-specific BIM execution plan is a separate deliverable when included in the agreed work.
Get Started→