MEPF
Systems.
Mechanical, electrical, plumbing, and fire-protection engineering support with coordination and issue review against the project design basis, applicable codes, and appointed approval responsibilities.
Start Project→MEPF disciplines and deliverables
The agreed scope defines the project stage, inputs, calculations, schematics, model detail, review authority, interfaces, and acceptance criteria for each discipline.
Mechanical / HVAC
HVAC design and coordination support based on the project loads, zoning, ventilation criteria, system strategy, controls, and review requirements.
Electrical Systems
Electrical design support from medium-voltage distribution through low-voltage building systems, life safety, and emergency power interfaces.
Plumbing Design
Water, drainage, and specialist plumbing support with calculations, schematics, layouts, schedules, and project-defined equipment information.
Fire Protection
Fire-protection design support against the identified code, authority, hazard, water-supply, detection, suppression, and interface requirements.
Define the system before detailing it
HVAC work begins with a documented design basis. The appointed professional and local authority retain the approvals and responsibilities assigned by the project jurisdiction and contract.
Inputs
Architectural and occupancy data, climate criteria, envelope assumptions, process loads, operating profiles, resilience needs, and applicable requirements.
System decisions
Load methodology, zoning, ventilation, equipment and distribution strategy, heat rejection, controls philosophy, access, and maintainability.
Design outputs
Calculations, schematics, layouts, plant-room arrangements, equipment schedules, control points, details, and coordinated model information.
Coordination
Ceiling and shaft zones, structure, architecture, electrical power, plumbing and fire systems, access clearances, drainage, and builder-work interfaces.
Review and handover
Named review stages, issue records, acceptance checks, commissioning inputs, approved changes, and the final information required by the client.
Optimize Your Building Systems
Share the project stage, applicable requirements, available inputs, disciplines, deliverables, programme, and review responsibilities for a scope-led response.
Get Started→